Fast-tracked project: 150,000 m³/d drinking water plant delivered in 12 months
WABAG successfully executed the design and construction of the Duong River Water Treatment Plant (WTP) in Hanoi in a record time of just 12 months. The plant is designed to treat raw water from the Duong River using a multi-stage system, incorporating WABAG’s proven technologies like lamella clarifiers and dual media filters. This facility ensures the supply of clean and safe drinking water to over 3 million residents in Hanoi and the surrounding provinces, reinforcing WABAG’s commitment to developing sustainable water infrastructure in Southeast Asia.
Project Features:
- Scope: Turnkey EPC execution, including design, engineering, equipment supply, installation, commissioning, performance testing, training, and technical assistance.
- Technologies: Multi-stage treatment with lamella clarifiers and dual media filtration.
- Impact: Rapid completion and operational success, delivering reliable drinking water to millions and marking a significant milestone as the fastest water treatment plant completed in Vietnam, and the first of its kind in Hanoi.