For Pure Water, Think WABAG!

WTP – Indorama Fertilizers, Nigeria

Water treatment plant for Indorama Fertilizer plant, Nigeria

Client

Indorama Fertilizers, Nigeria

Location

Port Harcourt, Nigera

Capacity

Capacity: 7,200 m3/d

WABAG has built a water treatment plant for the Fertilizer Project in Port Harcourt, comprising Decarbonators, Filtration, and Mixed Bed Exchangers for the production of potable and demineralized water. The Demineralization plant consists of two streams and contributes substantially to the water requirements of the fertilizer plant. Borewell water serves as the raw water source.

  • Technologies:
    • Decarbonators
    • Filtration (auto backwash filter)
    • De-cationization(SAC) (Regenerant: H2SO4)
    • De-Anionization(SBA)
    • Mixed bed Exchanger (MB)
    • Potable water filters (ACF): 50 m3/h
    • Neutralization Pit
  • Impact: The objectives of the water treatment plant are to ensure reliable operation through the continuous production of demineralized water, while reducing operating costs and minimizing environmental impact.