Newsroom
WABAG is one of the world's leading companies in the water treatment field.
13 October 2018Duong River WTP (Phase 01): Fastest in Vietnam and first in Hanoi
Duong River WTP (Phase 01): Fastest in Vietnam and first in Hanoi
The drinking water treatment plant was designed and built in the record time of only 12 months.
WABAG was awarded the contract on design and build basis for a new drinking water treatment plant in the city of Hanoi in October 2017. The 150 MLD WTP has been successfully executed in a record time frame of 12 months and will ensure clean and safe drinking water for over 3 million people in Hanoi and the surrounding provinces.
The WTP treats raw water from Duong River in a multi-stage system using WABAG’s proven technologies such as lamella clarifiers and dual media filters. WABAG was responsible for design & engineering, equipment supply, installation, commissioning, performance tests, training and technical assistance of the plant. The project which was built on turnkey basis is the fastest to be completed in Vietnam and the first of its kind in Hanoi.
The award of contract and successful execution reinforces WABAG’s presence in South East Asia and vision to develop sustainable water infrastructure in CMLV (Cambodia, Myanmar, Laos, and Vietnam) countries.