Wastewater Treatment & Enengy Neutral Plant

Kodungaiyur Power Neutral Plant:
Converting Waste to Wealth Comprehensive Sewage Treatment which focuses on resource recovery with the conviction that
“Sewage is a resource, not a liability”

Tobacco Industry – ETP for Otopeni factory


Project

Wastewater treatment & Reclamation Plant

Client

Philip Morris International

Location

Otopeni, Romania

The state-of-the-art factory of Philip Morris International (PMI) in Otopeni, located very close to Bucharest, is to be expanded by y new production line which requires also a respective effluent treatment plant. A tailor-made multi-stage treatment plant employing advanced technologies to meet all requirements will be installed. The plant is designed for a capacity of 800 m3/day with additional treatment possibility of 800 m3/day for utilities wastewater to make it suitable for discharge or reuse.

Package

  • Dissolved Air Flotation (DAF)
  • Biological treatment – the WABAG FLUOPUR® process (MBBR technology)
  • Dual Media Filter
  • Activated Carbon (GAC) Filtration
  • Odour control system

Al Kharj Industrial City


Project

Water Reclamation Plant for new industrial park

Client

Alkhorayef Water & Power Technologies comp. Ltd.

Location

Al Kharj, Saudi Arabia

Realisation of an effluent treatment plant with the target of the reuse of industrial effluents emanating from various production facilities – including wood and metal industries, construction material production as well as chemical and petroleum industries. Employment of a multi-stage-treatment system with a capacity of 10,000 m3/d.

Package

  • Pre-treatment
  • Chemical Precipitation
  • Primary Sedimentation
  • Equalization
  • Biological Treatment
  • Disc Filtration
  • Disinfection
  • Sludge treatment
  • Odor treatment

UJAMS Industrial Park


Project

Wastewater treatment & Reclamation Plant

Client

UWTC (JV, leaded by WABAG) , for the City of Windhoek.

Location

Windhoek, Namibia

The first Industrial Wastewater Treatment & MBR along with Reuse situated in Namibia. Based on MBR this plant completely recycles a crucial influent which comprises of wastewater blends from a tannery, a brewery, an abattoir and a chocolate factory. The plant showcases state of the art MICROPUR-MBR® technology supported in the later phases by UV, sludge treatment and exhaust air treatment.

The plant is a prime example of WABAG‘s technological knowhow when it comes to Industrial Water Reclamation. This project received the Distinction Award for the “Industrial Water Project of the Year 2015” at the Global Water Summit in Athens, Greece.

Package

  • Pre-treatment
  • Dry weather buffer tank including pH correction
  • Fine sieving by MICROPUR®
  • Membrane Bioreactor – MBR
  • UV-Disinfection
  • Clear water tank
  • Sludge treatment
  • Odour treatment

Wastewater Treatment for Dairy effluents

Project

Effluent treatment for dairy “Tunisie Lait”

Client

Tunisie Lait

Location

Sidi Bou Ali, Tunisia

WABAG has realized a wastewater treatment plant for the purification of effluents emanating from the dairy “Tunisie Lait” located in Sidi Bou Ali (25 km from Sousse). The project included the design, detail engineering, supply, installation and commissioning of the equipment for the industrial wastewater plant. The process employed is a low-load activated sludge treatment which enables the achievement of the required treated effluent quality.

Package

  • Screen, homogenization, grease removal
  • Biological reactor with anoxic tank
  • Degassing zone
  • Secondary sedimentation tank
  • Sludge thickening and dewatering Sludge beds in safety

Wastewater Treatment Plant for Beverages Production


Project

Refurbishment of Dragon WWTP

Client

Pepsi Co. International

Location

Bucharest, Romania

Modernisation of industrial effluent treatment plant based on the MBBR process (FLUOPUR®) with a capacity of 2,550 m3/d. The new design was successfully tested on the spot for several months using a pilot prior to full-scale installation. Turnkey completion followed by 15 months O&M.

Package

  • Pre-treatment
  • Ph control
  • Biological treatment (MBBR process)
  • Sludge dewatering (new)
  • Design, engineering, supply, installation, commissioning
  • O&M

Wastewater Treatment Plant for Snack Production


Project

Modernisation & Upgrade of Kashira WWTP

Client

Pepsi Co. International

Location

Moscow, Russia

The Kashira plant is one of the largest and most modern snack manufacturing sites both in Russia and continental Europe. In line with PEPSI Co‘s intention to increase the production capacity, it awarded WABAG Romania with the refurbishment and extension of the WWTP with a capacity of 1,460 m3/d (average).

Package

  • Increase of capacity from 45 m3/h to 60 m3/h (peak 105 m3/h)
  • Renewal and extension of the electro-mechanical equipment
  • Design, equipment supply, installation, commissioning and start-up.

Raw Water Treatment Plant

Project

Raw water treatment plant

Client

DANGOTE Fertilizer Plant

Location

Lagos, Nigeria

Raw water treatment plant for Nigeria’s largest fertiliser complex using a combination of biological treat-ment (SBR) and membrane filtration – ultrafiltration & reverse osmosis – as a tertiary treatment.

Package

  • Biological treatment system
  • Dual Media Filter
  • Ultrafiltration system
  • Pre-treatment, Filtration, Backwash
  • Chemical enhanced backwash (CEB)
  • UF permeate tank
  • RO system
  • Cartridge filters
  • RO membranes
  • CIP system
  • Reject discharge system
  • Outfall piping & sub-sea diffuser piping for reject disposal

Water Treatment Plant

Project

Water Treatment Plant

Client

Indorama Eleme Fertilizer & Chemicals Ltd

Location

Port Harcourt, Nigeria

Objectives

  • Reliable operation
  • Continuous production of Demineralized water
  • Reduction of operating costs
  • Low impact to the environment

Package

  • Decarbonators
  • Filtration (Auto backwash filter)
  • De-cationization (SAC)
  • De-Anionization (SBA)
  • Mixed bed Exchanger (MB)
  • Potable water filters (ACF)
  • Neutralization Pit ( N. Pit)

Water Treatment Plant

 

Project

Ostrava Steel Plant

Client

Arcelor Mittal

Location

Ostrava, Czech Republic

WABAG blazed through intense competition to upgrade the water filtration plant for ArcelorMittal Ostrava a.s., the largest steelmaker in the Czech Republic and part of the world’s largest steel and mining group ArcelorMittal.

Package

  • Upgrade of Water Treatment Plant: two-chamber sand pressure filters, filtration and wastewater pumps incl. chemical dosing and sludge treatment.

Sustainable solutions. For a better life.

The WABAG Group head quartered in Chennai with its global presence in 4 Continents and more than 20 countries has a work-force of more than 2,000. With a history dating back more than ninety years, the group has emerged as a leading pure play water technology player across the globe with focus on emerging markets.

Connect with us

© 2025

We use cookies to recognize your repeat visits and preferences, so as to optimize your browsing experience on this website. By clicking "I Accept" on this banner, or using our site, you consent to the use of cookies unless you have disabled them.

TOP